The Build

Loading the plates.

Every stage adds weight. Here's exactly where HyperFlex is on the way to opening its doors.

✓
October 2025

Equipment Sourced

Locked in our equipment partners and began sourcing brand new gear from the best brands in the industry.

✓
March 2026

Location Hunting

Searched Inner City Brisbane for the right home for HyperFlex.

✓
July 2026

Location Secured

Signed on our Inner City Brisbane location. Atlantis and Arsenal Strength equipment arrived on site.

✓
September 2026

Preliminary Designs

First concepts and layouts for the HyperFlex floor drawn up.

●
October 2026

Final Designs

Locking in the final designs for the fit out.

05
End of October 2026

Build Starts

Construction and fit out begin at the end of October and run through November and December, with equipment installed on site.

06
End of January 2027

Opening

HyperFlex opens its doors in Inner City Brisbane.